Grange Construction & Roofing Ltd. Chooses Clad Pad for Enhanced Cladding Protection

Location

Dublin

Project Type:

Data Center

Project Timeline:

4 months

Grange Construction & Roofing Ltd., a leading construction and roofing specialist, partnered with Clad Pad to implement a revolutionary cladding protection system on their [Project Type] project in [Location]. This case study highlights how Clad Pad’s innovative magnetic pads significantly reduced cladding damage, streamlined installation, and contributed to the project’s sustainability goals.

Grange Construction & Roofing Ltd. is a highly respected construction firm with a strong track record of delivering high-quality building projects across Ireland. With over 25 years of experience, they specialize in extensive experience with high performance weather proofing systems including flexible PVC sheeting, polyester based membranes, mastic asphalt, and architectural cladding.

The Challenge - Protecting Delicate Cladding in a Fast-Paced Environment

On this project, Grange Construction faced the challenge of protecting a large expanse of delicate aluminum composite panel cladding from damage caused by:

  • Heavy foot traffic from site personnel
  • Impacts from tools and equipment
  • Dust and debris accumulation
  • The risk of damage during adjacent construction activities

Traditional protection methods, such as corriboard, were deemed inefficient, wasteful, and potentially inadequate for the level of protection required.

The solution

Grange Construction chose Clad Pad as the primary cladding protection system due to its innovative magnetic design and proven effectiveness. Clad Pads were applied to all external cladding panels up to 8 metres.

0 +

Over 100 Clad Pads Used

0 %

Clad Pad's robust protection significantly minimized damage to cladding panels, resulting in a 90% reduction in rework compared to previous projects.

0 %

The quick and easy installation of Clad Pad accelerated the cladding protection process by 25%, saving valuable labor hours.